our first dry-type trt was put into operation in tangshan stainless steel in 2004. it took only 7 months from design to operation, which created the shortest delivery time record of similar unit in ch
in 2008, two sets of trt with efficient axial outlet, dry and wet dual-purpose which were the biggest in china, were put into operation in ansteel for 4,200 m3 blast furnace system.
eight sets of trt were successfully put into operation in rizhao steel. the total installed capacity is about 50mw. we started our general contract service since this project.
our first trt was put into operation in tangsteel in 1993. during its more than ten years’ operation no blades was replaced, which created the longest service life record of trt blades in china. in 19